2.2 Non-Government publications. The following documents form a part of
this specification to the extent specified herein. Unless otherwise
specified, the issues of the documents which are DoD adopted are those listed
in the issue of the DODISS cited in the solicitation. Unless otherwise
specified, the issues of documents not listed in the DODISS are the issues of
the documents cited in the solicitation (see 6.2).
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
Boiler and Pressure Vessel Code, Section IX, Qualification Standard for
Welding and Brazing Procedures, Welders, Brazers, and Welding and Brazing
Operators.
(Application for copies should be. addressed to the American Society of
Mechanical Engineers, 345 East 47th Street, New York, NY 10017.)
AMERICAN WELDING SOCIETY, INC. (AWS)
A5.1
-
Covered Carbon Steel Arc Welding Electrodes.
A5.5
-
Low-Alloy Steel Covered Arc-Welding Electrodes.
A5.1O
-
Bare Aluminum and Aluminum Alloy Welding Electrodes and Rods.
A5.18
-
Carbon Steel Filler Metals for Gas Shielded Arc Welding.
(Application for copies should be addressed to the American Welding Society,
Inc., 550 NW. LeJeune Road, P.O. Box 35lO4O, Miami, FL 33135.)
(Non-Government standards and other publications are normally available from
the organizations which prepare or which distribute the documents. These
documents also may be available in or through libraries or other informational
services.)
2.3 Order of precedence. In the event of a conflict between the text of
this document and the references cited herein (except for related associated
detail specifications, specification sheets or MS standards), the text of this
document takes precedence. Nothing in this document, however, supersedes
applicable laws and regulations unless a specific exemption has been obtained.
3.
REQUIREMENTS
3.1 Description. The bridge bays and bridge bay components shall be in
accordance with the applicable top assembly drawings (see 2.1) and as
specified herein.
3.1.1
Drawings. The drawings forming a part of this specification are
end product drawings. No deviation from the prescribed dimensions or
tolerances is permissible without prior approval of the contracting officer.
Where tolerances could cumulatively result in incorrect fits, the contractor
shall provide tolerances within those prescribed on the drawings to ensure
correct fit, assembly and operation of the bridge bays. Any data (e.g., shop
drawings, layouts, flow sheets, processing procedures, etc.) prepared by the
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business